ZHUOJIN-LOGOZhuojin Pipe Fitting Co., Ltd
Zhuojin Pipe Fitting Co., Ltd
STEEL PIPE · FITTING · WELDING TECHNICAL STUDY

Examination and Discussion of Composite and Bonded Steel Pipe Development Issues

Literature Overview

The paper by He Defu and Wang Jingying (2017), published in Steel Pipe (Vol. 46, No. 3, pp. 76-82), is the second part of a comprehensive examination of composite and bonded steel pipe development issues. Authored by experts from Shanghai Jiuli Industry and Trade Development Co., Ltd. and Zhejiang Dechuan Pipe Co., Ltd., this paper discusses the essential differences between metallurgical composite steel pipe and mechanical bonded steel pipe, explores problems in the development of direct internal overlay welding of corrosion-resistant alloy (CRA) composite steel pipe, proposes methods to optimize weld quality and ensure manufacturing and application quality, compares domestic and international heat treatment standards for composite steel plates (pipes), discusses bond quality inspection methods, and briefly addresses material selection criteria for composite steel pipe.

Core Technical Content

Metallurgical Composite vs. Mechanical Bonded Steel Pipe

The paper draws a fundamental distinction between two types of composite steel pipe:

Direct Internal Overlay Welding of CRA Steel Pipe

The paper addresses problems encountered in the direct internal overlay welding of corrosion-resistant alloy (CRA) layers on carbon steel pipe. This method involves welding a CRA overlay directly onto the internal surface of a carbon steel pipe to provide corrosion resistance. Key issues include:

  1. Welding procedure optimization: The welding procedure must be carefully designed to minimize dilution of the base material into the CRA overlay, which can compromise the corrosion resistance of the overlay layer.
  2. Weld groove preparation: The geometry and preparation of the weld groove significantly affect the weld quality and the effectiveness of the CRA overlay.
  3. Filler metal selection: The choice of filler metal must be compatible with both the base carbon steel and the CRA overlay material to ensure proper bonding and corrosion resistance.
  4. Heat treatment requirements: Post-weld heat treatment may be required to relieve residual stresses and improve the mechanical properties of the weld and heat-affected zone.

Weld Quality Optimization Methods

The paper proposes several methods to optimize the weld quality of composite or bonded steel pipe:

Heat Treatment Standards Comparison

The paper compares domestic and international standards for heat treatment of composite steel plates (pipes):

Standard Issuing Body Scope Key Requirements
GB/T China National Standard Domestic composite plates/pipes Heat treatment temperature, time, cooling rate
ASTM A403 American Society for Testing and Materials Composite plates Heat treatment procedures and acceptance criteria
EN 10204 European Committee for Standardization Composite plates Material certification and heat treatment documentation
JIS Japanese Industrial Standards Composite plates Heat treatment and inspection requirements

The differences between these standards include variations in recommended heat treatment temperatures, holding times, cooling rates, and acceptance criteria. Engineers must be aware of these differences when specifying and manufacturing composite steel pipe for international projects.

Bond Quality Inspection Methods

The paper discusses methods for inspecting the bond quality of composite steel pipe:

Material Selection Criteria

The paper briefly addresses material selection for composite steel pipe, considering:

Technical Points and Engineering Implications

Manufacturing Process Considerations

Process Parameter Impact on Quality Control Method
Heat input Dilution, HAZ properties Monitor and control welding parameters
Interpass temperature Microstructure, residual stress Use thermocouples and preheating
Shielding gas composition Oxidation, porosity Gas analysis and flow rate monitoring
Preheating temperature Cracking resistance Temperature measurement and control
Post-weld heat treatment Residual stress relief Controlled furnace or induction heating

Common Defects and Countermeasures

Defect Type Cause Countermeasure
Lack of fusion Insufficient heat input, poor groove preparation Increase heat input, improve groove geometry
Porosity Shielding gas contamination, moisture Clean base material, use dry shielding gas
Cracking High carbon equivalent, high residual stress Preheat, reduce heat input, post-weld heat treatment
Dilution Excessive base metal melting Use multiple passes, reduce heat input
Bond defect Incomplete metallurgical bonding Optimize welding parameters, verify with UT

Connection to Engineering Practice

Composite and bonded steel pipe is widely used in oil and gas production, chemical processing, and other industries where corrosion resistance is critical. The selection between metallurgical composite and mechanical bonded pipe depends on:

For engineers specifying composite steel pipe, the following considerations are important:

  1. Clearly define the service conditions including corrosive medium, temperature, pressure, and flow velocity.
  2. Select appropriate base and overlay materials based on corrosion resistance and mechanical property requirements.
  3. Specify the manufacturing method (metallurgical composite or mechanical bonded) based on service severity and standards requirements.
  4. Define comprehensive inspection and testing requirements including NDT methods and acceptance criteria.
  5. Ensure compliance with applicable standards such as API 5L, NACE MR0175/ISO 15156, and relevant ASTM or EN specifications.

Key Questions and Reflections

The paper raises several important issues for further consideration:

The discussion of bond quality inspection methods is particularly important, as the integrity of the bond between base and overlay layers is critical to the performance of composite steel pipe. Engineers should ensure that appropriate inspection methods are specified and that inspection personnel are qualified and experienced in testing composite materials.

Study Insights and Implications

This paper provides a comprehensive overview of the key issues in composite and bonded steel pipe development, covering manufacturing methods, weld quality optimization, heat treatment standards, bond inspection, and material selection. The distinction between metallurgical composite and mechanical bonded pipe is fundamental and should be clearly understood by engineers when specifying composite steel pipe for service. The comparison of domestic and international heat treatment standards highlights the importance of standards harmonization for global trade and project execution. The proposed methods for optimizing weld quality and ensuring manufacturing and application quality are practical and applicable to current industry practice. For engineers involved in the specification, manufacturing, and inspection of composite steel pipe, this paper serves as a valuable reference that addresses many of the practical issues encountered in the field. The emphasis on material selection criteria based on service conditions is particularly important, as the correct material selection is the foundation of successful composite steel pipe application.