Literature Overview and Core Findings

The study presents a numerical simulation of a prefabricated steel pipe-Larsen steel sheet pile cofferdam, a temporary structure used for deep foundation construction in water or soft soil. The system consists of large-diameter steel pipe piles driven at intervals, with Larsen steel sheet piles interlocked between them to form a watertight enclosure. The literature reports that the numerical simulation, using a finite element model with soil-structure interaction, predicts the deformation and stress distribution in the pipe piles and sheet piles under water pressure and soil pressure. The key finding is that the pipe piles act as the main load-bearing elements, transferring the lateral earth and water pressure to the soil through their flexural stiffness, while the sheet piles primarily provide watertightness and transfer the load to the pipe piles through the interlock. The simulation shows that the maximum bending moment in the pipe piles occurs at the point of maximum lateral pressure, typically one-third to one-half of the excavation depth from the bottom, and that the sheet pile interlock is the critical connection that can fail if the lateral pressure is too high.

Technical Points: Structural System and Load Path

The structural system is a hybrid of large-diameter pipe piles and sheet piles. The pipe piles, typically 600–1200 mm in diameter with a wall thickness of 10–20 mm, are driven at intervals of 2–4 m. The sheet piles, typically Larsen type with a section modulus of 1,000–2,000 cm³/m, are interlocked between the pipe piles. The load path is as follows: the lateral earth and water pressure acts on the sheet piles, which transfer the load to the pipe piles through the interlock; the pipe piles then transfer the load to the soil through their embedment. The critical design parameters are the pipe pile diameter and wall thickness, the sheet pile section modulus, the interlock strength, and the embedment depth of the pipe piles. The table below summarises typical parameters and their effect on the structural behaviour.

Parameter Typical Range Effect on Structural Behaviour
Pipe pile diameter 600–1200 mm Larger diameter increases flexural stiffness and load capacity
Pipe pile wall thickness 10–20 mm Thicker wall increases bending capacity and corrosion allowance
Pipe pile spacing 2–4 m Wider spacing increases load on sheet piles and interlock
Sheet pile section modulus 1,000–2,000 cm³/m Higher modulus increases bending capacity of the wall
Interlock strength 200–400 kN/m Higher strength prevents separation of the wall
Embedment depth 0.5–1.0 × excavation depth Deeper embedment increases stability and reduces toe movement

Steel Pipe and Sheet Pile Supply: Quality and Delivery Considerations

The steel pipe piles for a cofferdam are a different product from the line pipe or structural pipe that we usually supply. They are typically made from hot-rolled steel plate, formed and welded by SAW or ERW, with a steel grade of Q235B or Q355B. The pipe must be straight, because a bent pipe will not drive vertically and will cause problems with the sheet pile interlock. The straightness tolerance is typically 1/500 of the length, which is tighter than the 1/1000 tolerance for line pipe. The pipe ends must be square and free of burrs, because the pipe is driven with a hammer and a damaged end will deform and cause the pile to drift. The sheet piles are a rolled product, supplied in lengths of 6–12 m, and they must be interlocked with the pipe piles using a special connector. The connector is a critical component; it must be welded to the pipe pile with a full-penetration weld, and the weld must be inspected by UT or MT. A common problem is that the connector is welded on the wrong side of the pipe, or that the weld is not straight, which causes the sheet pile to bind during driving. The delivery schedule is also critical. A cofferdam is a temporary structure, and the construction schedule is usually tight. If the pipe piles or sheet piles are delivered late, the whole foundation construction is delayed, and the cost of the delay can be far greater than the cost of the steel. We have learned to order the pipe piles with a corrosion allowance of 2–3 mm, because the piles are driven in water and soil and will corrode during the construction period, especially in marine environments.

Site Practice: Installation, Interlock and Lessons Learned

The installation of a pipe-sheet pile cofferdam is a demanding operation that requires careful coordination between the crane, the pile driving hammer and the welders. The pipe piles are driven first, using a vibratory hammer or an impact hammer, and the sheet piles are then driven between them. The interlock between the sheet pile and the pipe pile connector must be clean and free of soil or debris; if the interlock is blocked, the sheet pile will not drive and the wall will leak. We have seen cofferdams where the sheet piles were driven with a misaligned interlock, causing the wall to lean and the excavation to be unstable. The solution is to use a guide frame to keep the sheet piles aligned during driving. The welding of the pipe pile splices is another critical operation. The pipe piles are typically supplied in lengths of 12–18 m, and they are spliced on site by welding. The splice must be a full-penetration weld, and the weld must be inspected by UT. A common defect is lack of fusion at the root of the weld, which can cause the pipe to leak and the cofferdam to flood. The watertightness of the cofferdam is the most important practical requirement. If the sheet pile interlocks leak, the excavation will flood and the construction will be delayed. The literature suggests using a sealant or a grout in the interlocks, but in practice we have found that a simple bentonite slurry or a bituminous sealant is often sufficient, provided the interlocks are clean and properly engaged.

Summary

The prefabricated steel pipe-Larsen sheet pile cofferdam is a practical and efficient solution for deep foundation construction in water or soft soil, but the numerical simulation only tells part of the story. The real challenge is in the supply and installation: the pipe piles must be straight and the connectors must be welded correctly, the sheet piles must be driven with a guide frame to maintain alignment, and the interlocks must be clean and sealed to prevent leakage. The shop floor must treat the pipe piles and connectors as precision products, and the site must enforce strict quality control on the splicing welds and the interlock engagement. If these practical issues are managed, the cofferdam will perform as designed, but there is no substitute for careful workmanship on site.