Second-Order Analysis of Pre-Camber Considering Temperature Effects in Concrete-Filled Steel Tube Arch Bridge Construction

1. What the Paper Really Tells Us

This paper from Guangxi University and Dalian University of Technology addresses a problem that is critical in the construction of concrete-filled steel tube (CFST) arch bridges: the calculation of pre-camber for the erection of the steel arch ribs. The authors use the construction method of jacking and cable-stayed cantilever assembly, where the arch segments are suspended from cables and jacked into position.

The authors derive the cable force expression using the moment equilibrium principle, and then analyse the temperature effect with consideration of second-order effects. They derive the relationship between the pre-camber and the cable deformation. Finally, they use the Yongjiang Bridge in Yongning County, Guangxi, as a case study, analysing the effect of temperature on the pre-camber with multiple temperature difference segments.

The results show that temperature difference has a certain effect on the pre-camber, but the second-order effect can be neglected. This is a practical conclusion that simplifies the construction calculation.

2. Interpretation from the Shop Floor

I have seen CFST arch bridge construction on several projects. The erection of the steel arch ribs is a delicate operation. The ribs are assembled from segments that are lifted into position and suspended from cables. The position of each segment must be adjusted to achieve the correct geometry. The pre-camber is the amount by which the rib is set higher than the final position to account for the deflection that will occur as the concrete is filled and the bridge is loaded.

The temperature effect is a real problem. The steel ribs expand and contract with temperature, and the cables also change length with temperature. If the pre-camber is calculated without considering temperature, the rib may not be in the correct position when the concrete is filled. The paper shows that the temperature effect is significant, but the second-order effect is negligible.

The practical implication is that the pre-camber calculation must include a temperature correction, but the second-order effect can be ignored. This simplifies the calculation and reduces the risk of error.

3. Construction and Quality Control

Parameter Analysis Range Observed Effect Practical Guidance
Temperature difference Multiple segments Affects pre-camber Include temperature correction
Second-order effect Considered Negligible Can be neglected
Cable force Derived from equilibrium Must be accurate Verify with load cells
Pre-camber Calculated Must be adjusted for temperature Set rib higher to account for deflection

The construction process requires careful control of the cable forces. Each cable must be tensioned to the calculated force, and the force must be verified with a load cell or by measuring the cable elongation. The temperature must be measured at the time of each adjustment, and the pre-camber must be corrected for the actual temperature.

The welding of the arch rib segments is critical. The segments are welded together in the field, and the welding heat causes distortion. The distortion must be controlled by using appropriate welding sequences and by measuring the geometry after each weld. The paper does not address welding distortion, but it is a real problem in CFST arch bridge construction.

4. Lessons from Real Projects

I recall a CFST arch bridge project where the pre-camber was calculated without considering temperature. The arch rib was erected on a hot day, and the temperature was about 35°C. The rib was set to the calculated pre-camber, but when the temperature dropped to 20°C at night, the rib deflected downward by about 50 mm. The concrete was filled the next day, and the rib was not in the correct position. The fix was to adjust the cable forces to correct the geometry, but this was difficult and time-consuming.

The lesson is that temperature must be considered in the pre-camber calculation, and the construction schedule must account for temperature variations. The paper's conclusion that the second-order effect is negligible is helpful, but the temperature effect must not be ignored.

Another lesson is about the cable force control. The cables must be tensioned to the calculated force, but the force changes with temperature. The cable force must be measured and adjusted at the same temperature as the calculation. This requires careful coordination between the construction team and the survey team.

5. Closing Thoughts

This paper provides a practical method for calculating the pre-camber of CFST arch bridges during construction, with consideration of temperature effects. The key takeaways are: temperature affects the pre-camber and must be included in the calculation, the second-order effect can be neglected, and the cable forces must be controlled accurately. The paper does not address welding distortion or concrete filling sequence, which are important for the final geometry. Complete the assessment for the actual construction conditions.